No | Client | Project Designation | Location | Service Provided | Project Period |
---|---|---|---|---|---|
1 | JOB Pertamina – Medco E&P Tomori Sulawesi | Jasa Perawatan Kelistrikan dan Instrumentasi CPP Senoro | CPP Senoro, Sulawesi Tengah | Maintenance service includes inspection, major and minor repairs, performance tests and provision supporting spare parts, included but not limited to :
| 19 Desember 2022 – 18 April 2026 |
2 | GE Renewable Energy | Sofia Offshore Converter Platform – Electrical & Mechanical Erection | Batam, Indonesia | Provide manpower, tooling, consumables for install and erection the electrical and mechanical equipment, included but not limited to :
| December 2022 – December 2023 |
3 | PT. Pertamina EP Zona 1 | Long Term Contract Pekerjaan Pembuatan / Modifikasi Tangki & Sistem Perpipaan Di Jambi Field & Lirik Field PT Pertamina Ep Zona 1 | Jambi Field & Lirik Field | Manufacture / Modification of Tanks & Piping Systems as well as civil works and other accessories at Jambi Field & Lyrics Field, included but not limited to :
| 4 November 2022 - 3 November 2024 |
4 | Medco Bangkanai Limited | Jasa Konstruksi Major Project Bangkanai | Bangkanai Block, Medco | Providing support services for operations, maintenance, construction works, supply of materials, equipment, equipment, personnel and other services, included but not limited to :
| 31 Oktober 2022 - 30 Oktober 2024 |
5 | PT. Pertamina Hulu Mahakam | Pipeline And Structure Small Maintenance Services | North Area and South Area of PHM Asset | The main purpose of this campaign is to maintain all pipelines & respective ROW’s making it accessible for inspection, patrol ling and also to perform repair/refurbishment of any condition unfavorable to the safe operation of the pipelines. The work shall cover the whole pipeline network & its respective ROW’s within the operational area of COMPANY in the Mahakam. The scope of work is divided into two work packages:
| September 2022- September 2025 |
6 | PT. Pertamina Hulu Mahakam | POMA General Services | East Kalimantan Pipeline Network | provide COMPANY with general services, such as routine general maintenance of pipeline Right of Way (RoW), meal and accommodation services, building maintenance and other Services required to support COMPANY operation during the CONTRACT period. This Contract Multi-user/Multiparties :
| September 2022- September 2024 |
7 | JOB Pertamina – Medco E&P Tomori Sulawesi | Pengadaan Jasa Pekerjaan Sipil Senoro CPP | CPP Senoro, Sulawesi Tengah | Providing support services for operations, maintenance, construction works, supply of materials, equipment, equipment, personnel and other services, included but not limited to :
| March 2022 – March 2024 |
8 | PT. Sumbawa Timur Mining | EPCM Water Distribution Line & Storage System | Huú Kec. Dompu - NTT | Stage 1 Engineering FEED & DEED for Water Distribution Line and Storage System Stage 2 Procurement, Construction, Management and maintenance for Water Distribution Line and Storage System | Stage 1 1 Februari – 21 April 2022 Stage 2 Mei 2022 – Agustus 2024 |
9 | Medco Energi Sampang Pty. Ltd. | Installation and Fabrication Services | Offshore South Madura and Onshore | Provision of engineering support, procurement, fabrication and installation (both Onshore and Offshore), inclusive civil, structural steel and concrete, painting and coating related to establishing of new facility(s), as well as modification of existing facilities. Including but not limited :
| January 2022 – January 2025 |
10 | PT Star Energy Geothermal Salak Pratama, Ltd | Scrubber Replacement and Refurbishment for Ex Units 4 and 5 Salak | Gunung Salak |
| 20 December 2021 – 19 December 2023 |
11 | PT Star Energy Geothermal Indonesia, Ltd | Infrastructure Construction and Post Drilling Services in Gunung Hamiding. | Gunung Hamiding | Engineering, Procurement, Fabrication and Construction of infrastructure and post drilling works for hamiding geothermal project. This project is intended to execute two following work phase : 1. Infrastructure Phase
| 15 November 2021 – 14 July 2023 |
12 | PT Star Energy Geothermal Salak, Ltd | Cooling Tower Repair Service for Salak | Gunung Salak | Provide cooling tower repair services with the following scope of work includes but not limited :
| 31 Agustus 2021 – 31 Agustus 2023 |
13 | PT. Pertamina Hulu Energi Offshore North West Java | Commisioning and Handover Certification and Services. | Commisioning for all PHE ONWJ area |
| 01 October 2020 - 29 September 2023 |
14 | ConocoPhillips (Grissik) Ltd | Wellsite and Pipeline Preparation | Suban- South Sumatera |
| Sept 2019 - Dec 2021 |
15 | Medco Natuna E&P Ltd | Matak Navigation Light Tower | Matak Area Natuna Sea, Indonesia |
| Sept 2019 - Sept 2020 |
16 | Medco Natuna E&P Ltd | Desalination and Filtration Unit Services Contract | Natuna Sea, Indonesia |
| Aug 2019 - Aug 2022 |
17 | PT Star Energy Geothermal Salak, | Provision of AWI 9 Conversion Stage 2 and Brine Out Field Injection Project for Salak Area | Gunung Salak |
| Oct 2018 - Nov 2019 |
18 | PT Star Energy Geothermal Salak, Ltd | Provision of Contruction Contract for Salak Nursery Maintenance Main Road Landslide Project | Gunung Salak | Provision of Construction support services including welding, scaffolding, civil work, electrical-instrumentation work, survey services, included but not limited to :
| 25 Jun - Dec 2018 |
19 | PT Synthetic Rubber Indonesia (PT SRI) | Routine Daily Maintenance Services – Mechanical | Manufacturing Plant - Cilegon |
| Jan 2018 – Agustus 2024 |
20 | BP Berau Ltd | Jasa Penunjang Operasional Pemeliharaan utk LNG Tangguh- BP | West Papua |
| Aug 2017 - Aug 2022 |
21 | Medco Natuna E&P Ltd | Micro and Small Modification Project at Block B Natuna Sea Area | Natuna Sea, Indonesia | Regular (planned) preventive as well as corrective (unplanned) maintenance at various offshore platforms FPSO / FSO. Typical works include :
| Aug 2017 - Aug 2021 |
22 | ConocoPhilips Indonesia Inc Ltd | Corrosion Under Insulation (CUI) Repair Contract | Natuna Sea, Indonesia | Partial and sectional replacement of pre- identified corrosion occurring under insulated pipeworks and static mechanical equipment | Apr 2016 - Oct 2019 |
23 | Chevron Geothermal -> PT Star Energy Geothermal Salak, Ltd | General Construction Services for Salak Area | Gunung Salak |
| Apr 2016 - Apr 2018 Continued to 2020 |
24 | ConocoPhillips Indonesia Inc Ltd | Specialty Welding, Materials & Services for Offshore Contract | Natuna Sea, Indonesia |
| Dec 2015 – Dec 2019 |
25 | ConocoPhillips (Grissik) Ltd | Suban 13 Flowlines and Wellsite Facility Engineering, Procurement & Construction Contract | Grissik Warehouse Palembang - Jambi, Indonesia |
| March 2015 - March 2016 |
26 | ConocoPhillips Indonesia Inc Ltd | Micro and Small Modification Project at Block B Natuna Sea Area | Natuna Sea, Indonesia | Regular (planned) preventive as well as corrective (unplanned) maintenance at various offshore platforms FPSO / FSO. Typical works include :
| Feb 2015 - August 2015 |
27 | ConocoPhillips (Grissik) Ltd | Engineering, Procurement, and Construction (EPC) Grissik GSPL USM Upgrade Project | Grissik Plan, Palembang, Jambi | Pre-Shutdown preparatory works (structural shelter opening, modify skids, reroute pipe work Replacement of 16” Ultrasonic Metering system (2 streams) during shutdown, finished in under 12 hours | Nov 2014 - Feb 2016 |
28 | ConocoPhillips Indonesia Inc Ltd | Engineering, Procurement, and Construction (EPC-2) of Onshore Pigging Facility Upgrade Batch-1 | Suban- South Sumatera |
| Jul 25, 2014 - Jul 24, 2015 |
29 | ConocoPhillips Indonesia Inc Ltd | Micro and Small Modification Project at Block B Natuna Sea Area | Natuna Sea, Indonesia | Regular (planned) preventive as well as corrective (unplanned) maintenance at various offshore platforms FPSO / FSO. Typical works incl:
| Apr 2013 - Mar 2015 |
30 | PT Rajawali Swiber Cakrawala | South Belut Development Project | Offshore Natuna |
| Jan 2013 - Oct 2014 |
31 | ConocoPhillips Indonesia Inc Ltd | Offshore Welding, fabrication and construction support Services | Natuna Sea, Indonesia |
| Jul 2012 - Mar 2013 |
32 | PT Nisconi Indonesia | North Belut Flowline Project, ConocoPhillips | Jakarta |
| Sep 2011 - Mar 2013 |
33 | ConocoPhillips Indonesia Inc Ltd | Suban 12 Flowlines Project | Grissik Warehouse Palembang - Jambi, Indonesia |
| Sep 2011 - Mar 2013 |
34 | Premier Oil Natuna Sea BV | Engineering, procurement and fabrication for Anoa Phase 4 early tie ins spool | Natuna Sea, Indonesia | Provision site survey. 3D laser scanning, pipe spools, engineering, procurement, fabrication, inspection, pressure test, flushing, drying, painting & preservation. | Jun - Sept 2012 |
35 | ConocoPhillips (Grissik) Ltd | Supply of pig launcher and receiver for Bentayan- Letang Pipe line | Grissik warehouse Palembang- Jambi, Indonesia | Material supply, fabrication of 8" & 12" pig launcher and receiverJan - May 2011 | Jan - May 2011 |
36 | ConocoPhillips Indonesia Inc Ltd | Offshore Welding, fabrication and construction services | Natuna Sea, Indonesia |
| Sept 2010 - Jun 2012 |
37 | ConocoPhillips Indonesia Inc Ltd | Offshore Welding, fabrication and construction services | Natuna Sea, Indonesia |
| Jun - Sept 2010 |
38 | ConocoPhillips Indonesia Inc Ltd | Hook-up & Commissioning of wellhead platform | North Belut Field, Offshore West Natuna Sea | Provision of accomodation barge, workbarge, workboat, man power and equipment for Hook- up & Commissioning of two wellhead platform (WHP-C & WHP-D) | Jun 2008- March 2010 |
39 | Hyundai Heavy Industries Co Ltd for Total E&P Myanmar, Ltd | Yadana Medium Compression Platform (MCP) Project | Yadana Field, Myanmar |
| Dec 2007-Mar 2008 |
40 | Hyundai Heavy Industries Co Ltd for Total E&P Myanmar, Ltd | Escravos Gas Project Phase 3 | Escravos FPSO, Offshore Nigeria |
| Feb 2007-May 2007 |
41 | ConocoPhillips Indonesia Inc Ltd | Hang Tuah Modification Project | Hang Tuah Field, Block B, Natuna Sea, Indomnesia | EPCI contract to install 16" pipeline & riser, topside piping and associated instrumentation/ controls. The scope including provide of heavy equipment and lifting equipment for site installation. | Jun 2006 - Mar 2007 |
42 | Hyundai Heavy Industries Co Ltd for Total E&P Myanmar, Ltd | West Seno Turn Around | West Seno Field Makassar Strait, Indonesia | Vessel Charter, provision of service (manpower, equipment & consumable) for install & replace of FRP Pipe System. | Jul 2005 - Oct 2005 |
43 | Hyundai Heavy Industries Co Ltd for Unocal Makassar Ltd. | West Seno Field Development Project | West Seno Field Makassar Strait, Indonesia | Hook-up / commissioning and maintenance of West Seno - FPU | 2003 – 2004 |
44 | PT. Technip Indonesia for ConocoPhilips Indonesia Inc. Ltd. | West Seno Field Development Project Block B Subsea Development Project | Natuna Sea, Indonesia | Modification works on Belida LGP, DPP-A and Hang Tuah Platform | 2003 - 2004 |